Our Work

The Mere Golf and Leisure Club 

Major refurbishment of the entrance area, bars, rooms and suites were carried out. The project was designed by Mather and Co and the main contractor was Workhaus.
The works were carried out over a four week period and delivered to a very high standard within a very tight control period.
Internal polished doors and general woodwork were specially prepared and primed for painting using Dulux products and specifications to give that spacious, light, modern feel. Many walls were finished in extra wide width vinyl wall coverings brought in from America.

 

PACE Plc

Major refurbishment of the office areas of PACE Plc at their head office in Victoria Mills, Saltaire. The main contractor was Waterhouse and the project was carried out in several phases over a 12 month period.

 

Down Hall Hotel

Bedroom refurbishment of historic country house hotel in Hertfordshire. Design work by Rachel McLane Ltd, Malton using Dulux & Zoffany paints and wallcoverings by Brian Yates & Tektura.

 